Tuesday, October 13, 2009

getting stuff done, ready for winter

truck emptied, next i am gonna put up plywood inside the walls, hang tools of it/ protect the metal a little.
just a few logs still needing to be bucked:

Friday, October 2, 2009

pest management

future greenhouse/ coldframe:
got these two double-pane french doors on freecycle and have two more coming my way. that is already a twelve foot long panel/wall eight feet high. should grow some tasty winter tomatoes. or whatever we decide to do with it.